HIL Ellesmere Port
Our HIL 100 Breakfast Hubs are moving into its third year, bringing together the key stakeholders at the heart of hydrogen production and offering a first hand information to help you understand the opportunities available. Low carbon hydrogen will be produced at the Stanlow Manufacturing Complex and will produce 3TWh of low carbon hydrogen – double the UK’s total current production of biomethane – which will be provided to industrial and eventually domestic customers in the region. The facility will deliver low cost, low carbon hydrogen at scale and high efficiency, and with a very high carbon capture rate – over 95% of the carbon used in the process will be captured and stored, thanks to the pioneering carbon capture technology. When operational, the facility will capture 600,000 tonnes of CO2 per annum – the equivalent of taking over 250,000 cars off the road.
Hydrogen will be distributed by way of a new pipeline network under development by Cadent, which will also provide the pathway for renewable hydrogen once costs come down in the future. The funding will also deliver the Front-End Engineering Design (FEED) of the plant, providing a reference design for the facility to be replicated across the UK and internationally.
To find out more email enquiry@hydrogenindustryleaders.com
Interested in the Event?